What Kimberly asked for
The Village surveyed residents in 2023 and again this summer. Both times, the answer pointed to the same place: the river, the woods, and the trails.
2026 survey: 548 neighbors
Word sizes follow the Village's own summary graphic. The Village's memo said natural area preservation and trail improvements reached "the top of the list." Source: July 20, 2026 Village Board packet (survey summary).
2023 survey: "We need more of this"
Share of respondents who said each facility needs "more in the future." Baseball/softball fields had the most "sufficient" answers (68%). Source: 2023 community survey, Appendix C of the 2024–2029 Outdoor Recreation Plan.
In residents' own words (2023)
"What happened to the Boardwalk & River overlook, Nature trails from the development?"
"More walking trails and easier access by the boat landing"
"Trails, especially Sunset park, need maintenance."
Source: written-in answers, 2023 community survey (Appendix C).
What the draft plan actually buys
Both concepts split their construction money almost the same way. Switch between them to compare.
It wears out
Synthetic fields are typically resurfaced every 8 to 10 years, at roughly 60% of the original cost.
It runs hot
On summer afternoons, turf surfaces run far hotter than grass.
Paperfest gets harder
Turf rules usually ban tent stakes and grills, require plywood under stages, and charge for melted spots.
Built for a season, or for every season?
Typical seasons in northeast Wisconsin. Turf fields get used about half the year. A balanced park works every month.
permanent trash cans cover all 73 acres of Sunset Park, all of them in parking lots.
trail lights anywhere in the park.
drinking fountain for the whole park. Neither draft concept names a line item for more cans, lights, or fountains.
What the same money could build
Keep Sunset Park great for sports: fix the fields and the failing ballfield buildings. Then balance the plan with the river, trails, and green space residents asked for.
A balanced Sunset Park: sports and the river
What other towns built
Signature parks and standout features, all for less than Kimberly's draft plan. Filter to compare.
The master plan timeline
The concepts are drafts. Public input is still open, and the Village says it "will directly shape" the final plan.
- Dec 2025Planner hiredVillage Board votes 7–0 to hire Rettler Corp. for $11,600.
- Apr 2026Sports user groups meetSchool district, youth baseball, softball, soccer, and lacrosse groups, plus the Fox Cities tourism bureau's sports director.
- May–Jun 2026Community survey #1548 responses. Nature, trails, and preservation top the list.
- Sept 21, 2026Concepts shown to the Village BoardDiscussion only, no vote.
- NowSurvey #2 is openFeedback on the draft concepts. Take it here.
- Nov 2026Plan Commission reviewFinal concepts tentatively presented. Date to be confirmed.
- Dec 2026Village Board adoption goalThe plan guides park spending for 5 to 20 years.
The official documents
Everything here comes straight from the Village of Kimberly website.
FAQ
Isn't this anti-sports?
No. The Village's own building assessment says the old concession stands and press boxes need replacing, and they should be fixed. We're asking for balance: fix the ballfields, and make sure turf and parking don't take 81% of a 20-year plan for our largest riverfront park.
Isn't it already decided?
No. The two concepts are drafts. Survey #2 is open now, the Plan Commission reviews final concepts in November, and the Village Board aims to adopt the plan in December.
Who pays for this?
The Village plans to phase projects over 5 to 20 years and pursue grants. Trails, river access, and natural areas are exactly the kinds of projects state park grants are built to fund.
What's wrong with synthetic turf?
It can make sense for a busy athletic field. But it gets resurfaced every 8 to 10 years at a big cost, it runs hot in summer, and it restricts events. Turf rules usually ban tent stakes and grills and require plywood under stages, which matters for Paperfest.
Does the plan include anything residents asked for?
A little. A play area and some walkway connections, under 2% of construction costs. Neither concept names a line item for more trash cans, trail lighting, or trail connections.
Who are Friends of Sunset?
Kimberly residents who love Sunset Park. We're not part of the Village or any organization. Every number here comes from Village documents, linked above. If you spot a mistake, send us a note and we'll fix it.
Get involved
Take the survey
It takes a few minutes. Tell the Village what you want for Sunset Park.
Take the Surveyforms.gle/8zpfrGTMt83FUcqi8
Contact the trustees
Reach out before the Plan Commission review in November. The Village Clerk can connect you.
Village Clerk: (920) 788-7500
Speak at public comment
Village Board meets most Mondays at 5 p.m., 515 W. Kimberly Ave. Anyone can speak during public comment.
Plan Commission agendasContact us
Questions, ideas, a correction, or want to help hand out flyers? Send a note. It goes only to the neighbors who run this site, and we never share it.